Showing 10 results

Archival description
Albert Clifford Labour
Advanced search options
Print preview Hierarchy View:

10 results with digital objects Show results with digital objects

Man shovelling dirt to protect property from flood waters of the Fraser River
Man shovelling dirt to protect property from flood waters of the Fraser River
BC Telephone linemen work to remove wires from a telephone pole that was threatened by the flood.
BC Telephone linemen work to remove wires from a telephone pole that was threatened by the flood.
Construction boat. Looking East from Mission- Matsqui Bridge
Construction boat. Looking East from Mission- Matsqui Bridge
Half a mile west of Dewdney Pumps. Crews of sandbaggers rush to fill a weak spot beneath the doub...
Half a mile west of Dewdney Pumps. Crews of sandbaggers rush to fill a weak spot beneath the double track CPR bed.
Tremblay Dam June 27th, 1948
Tremblay Dam June 27th, 1948
Raising span-Mission-Matsqui Bridge-June 28th 1948
Raising span-Mission-Matsqui Bridge-June 28th 1948
Raising span of Mission-Matsqui Bridge
Raising span of Mission-Matsqui Bridge
Raising Span of Mission-Matsqui Bridge
Raising Span of Mission-Matsqui Bridge
Repairing highway - Dewdney Pumps July 13th, 1948
Repairing highway - Dewdney Pumps July 13th, 1948
Raising span- South end Mission- Matsqui Bridge - June 28th, 1948
Raising span- South end Mission- Matsqui Bridge - June 28th, 1948